Hit every 7-day notification window. Evidence every possession overrun.

Rail contracts have unforgiving contractual notice windows — miss the 7-day rule and the claim is barred. Possession overruns, red-zone lockouts and late-notice cancellations are all high-value events that must be evidenced and noticed inside a tight window.

RRekkord · Rail & infrastructure · Live workspace
Live
Open events
27
Value in flight
£58,240
Recovery rate
68%
Latest events
  • Waiting time — permit delay
    £1,480Needs evidence
  • Failed access — lock-out
    £350Ready to submit
  • Additional labour — site cond.
    £1,800Under review
  • Extra visit — variation
    £900Approved
0
missed notification windows across 40 possessions
100%
of overruns evidenced at handback
£190k
recovered from disputed handbacks in Y1
Event types

The commercial events happening on your sites right now.

Every one of these is a chargeable event. Rekkord captures them at source and prices them against your contract.

Possession overrun

Handback delayed by 45 minutes — chargeable under the works package plan.

Late-notice cancellation

Possession cancelled inside 48h — mobilised crew cost recoverable.

Red-zone lockout

Access denied due to adjacent line failure.

PICOP / COSS additional attendance

Client-instructed extended cover.

Isolation delay

Traction current isolation late — chargeable stand-down.

Site condition variation

Ballast / vegetation not as tendered.

RRekkord · Events · 13 events · £16,750 open
Live
All statuses · All types · Rolling 30 daysAuto-linked to contracts
EventClient / SiteTypeValueStatus
Materials uplift — premium fixtures, Halcyon
Halcyon — Pinnacle HouseAdditional materials£670Draft
Waiting time — permit delay, Brightwater
Brightwater — Main HospitalWaiting time£1,480Needs evidence
Failed access — Oxford St lock-out
Meridian — Oxford St FlagshipFailed access£350Ready to submit
Additional labour — changed site conditions
Northgate — Milton Keynes DCAdditional labour£1,800Under review
Damage — client forklift struck bollard
Northgate — Milton Keynes DCDamage / incident£1,450Submitted
Rework — incorrect client spec, Waterloo
Kingsford Rail InfrastructureRework£2,400Under review
Live pipeline

Every open claim, tracked to payment.

RRekkord · Recovery Tracker
Live
13 claims · £16,750 open · avg 7d in review
All clients · All sectors
Draft · 2
  • Materials uplift — Halcyon
    £670Today
  • Missed attendance — Meridian
    £2901d
Ready to submit · 2
  • Waiting time — Brightwater
    £1,4801d
  • Failed access — Oxford St
    £3502d
Under review · 3
  • Additional labour — Northgate
    £1,8006d
  • Rework — Kingsford Rail
    £2,40012d
  • Damage — Pinnacle
    £1,4504d
Approved · 2
  • Variation — Meridian T3
    £3,250Paid 3d
  • Extra visit — Halcyon
    £900Invoice raised
Workflow

From site capture to invoice, in four steps.

  1. 1
    Supervisor captures at handover

    Possession start / handback timestamps, PICOP name, weather, site conditions.

  2. 2
    AI drafts Network Rail / TfL notice

    Compliant delay / variation notice drafted against the correct standard.

  3. 3
    Cost pack from PICOP schedule

    PICOP + labour + plant + on-cost built from the contract rates.

  4. 4
    Auto-submitted inside notice window

    7-day contractual window tracked automatically — never barred.

Key benefits

Why rail & infrastructure teams choose Rekkord.

Zero missed notice windows

Automated deadline tracking means no claim is ever barred on a technicality.

Possession evidence at handback

Captured while the PICOP is still on-site — signed, timestamped, geolocated.

Standards-compliant notices

AI drafts against Network Rail / TfL wording — commercial teams review, not author.

Portfolio-level possession scorecard

See possession performance and recovery across every project.

See Rail & infrastructure recovery in action.

Live demo with sector-realistic events, contracts and claims — no signup friction.