M&E installers

Charge for the waiting time and rework you're already absorbing.

M&E packages sit at the mercy of preceding trades. When they run late you wait, when the client changes their mind you rework — and neither gets charged because the paperwork burden is too high mid-project.

RRekkord · M&E installers · Live workspace
Live
Open events
27
Value in flight
£58,240
Recovery rate
68%
Latest events
  • Waiting time — permit delay
    £1,480Needs evidence
  • Failed access — lock-out
    £350Ready to submit
  • Additional labour — site cond.
    £1,800Under review
  • Extra visit — variation
    £900Approved
£48k
recovered in waiting time on one school refurb
6%
margin lift on disruption-heavy packages
100%
of rework categorised at capture
Event types

The commercial events happening on your sites right now.

Every one of these is a chargeable event. Rekkord captures them at source and prices them against your contract.

Waiting time / stand-down

Preceding trade not complete — crew stood down for 4 hours.

Rework — client change

Containment reroute after signed-off design change.

Late information

Coordinated services drawing issued after installation began.

Access denial

Riser locked out by another package — crew redeployed.

Design clash

Clash resolution work not in the sub-contract scope.

Commissioning delay

Power not available — repeat commissioning visit required.

RRekkord · Events · 13 events · £16,750 open
Live
All statuses · All types · Rolling 30 daysAuto-linked to contracts
EventClient / SiteTypeValueStatus
Materials uplift — premium fixtures, Halcyon
Halcyon — Pinnacle HouseAdditional materials£670Draft
Waiting time — permit delay, Brightwater
Brightwater — Main HospitalWaiting time£1,480Needs evidence
Failed access — Oxford St lock-out
Meridian — Oxford St FlagshipFailed access£350Ready to submit
Additional labour — changed site conditions
Northgate — Milton Keynes DCAdditional labour£1,800Under review
Damage — client forklift struck bollard
Northgate — Milton Keynes DCDamage / incident£1,450Submitted
Rework — incorrect client spec, Waterloo
Kingsford Rail InfrastructureRework£2,400Under review
Live pipeline

Every open claim, tracked to payment.

RRekkord · Recovery Tracker
Live
13 claims · £16,750 open · avg 7d in review
All clients · All sectors
Draft · 2
  • Materials uplift — Halcyon
    £670Today
  • Missed attendance — Meridian
    £2901d
Ready to submit · 2
  • Waiting time — Brightwater
    £1,4801d
  • Failed access — Oxford St
    £3502d
Under review · 3
  • Additional labour — Northgate
    £1,8006d
  • Rework — Kingsford Rail
    £2,40012d
  • Damage — Pinnacle
    £1,4504d
Approved · 2
  • Variation — Meridian T3
    £3,250Paid 3d
  • Extra visit — Halcyon
    £900Invoice raised
Workflow

From site capture to invoice, in four steps.

  1. 1
    Engineer captures live

    Start photo + end photo of waiting time, site conditions, GPS. Automatic duration calc.

  2. 2
    AI cross-references contract clause

    Stand-down / disruption clause referenced automatically.

  3. 3
    Rework logged with root-cause

    Coded to client-instruction vs. own-fault — protects the pack from pushback.

  4. 4
    Monthly disruption claim

    Compiled automatically with cost build-up ready for the QS.

Key benefits

Why m&e installers teams choose Rekkord.

Waiting time actually recovered

The single biggest hidden cost in M&E — finally captured at source.

Rework categorised properly

Client-instructed rework separated from own-quality issues, protecting the claim.

Programme evidence built-in

Timestamps + photos give the QS a bulletproof narrative for any EOT.

Package-level P&L clarity

See exactly which packages are haemorrhaging margin on disruption — before it's too late.

See M&E installers recovery in action.

Live demo with sector-realistic events, contracts and claims — no signup friction.