New — AI Claim Pack Generator

Capture every change.
Recover every entitlement.

The AI-powered commercial recovery platform for contractors, subcontractors and service businesses. Turn variations, delays and aborted visits into paid claims — without hiring another QS.

No credit card. Fully seeded demo workspace. Live in under 30 seconds.
RRekkord · Dashboard · Today
Live
OverviewEventsClaimsTracker
Rolling 30 days · All clients
Open exposure
£184,250
12%vs 30d
Approved MTD
£46,900
8%
Events captured
127
18this week
Ageing > 21d
9
3need chase
Recovery pipeline
Cumulative claim value · last 30 days
Submitted Approved
Submitted
£312,480
Approved
£193,720
Recovery rate
62%
Needs action today
5 open
  • Waiting time — Brightwater NHS
    £1,480 · Notice window
    Review
  • Aborted visit — Meridian Oxford St
    £350 · Submit today
    Urgent
  • Additional labour — Northgate DC
    £1,800 · Client review
    Watch
  • Rework — Kingsford Rail
    £2,400 · Chase response
    Review
  • Damage — Halcyon Pinnacle
    £670 · Draft
    Draft
60s
Field capture
3–8%
Revenue lift
£240k
Avg recovered / yr
4.9/5
Field team rating
The silent leak

You're doing the work. You're not getting paid for it.

Every FM contractor, subbie and service business bleeds margin through commercial events that never make it into an invoice. Not because the entitlement isn't there — but because the paper trail isn't.

Scope creep

Client asks for 'just one more thing'. Nobody writes it up. It becomes free work.

Aborted visits

Engineer arrives, no access. Two hours lost. No charge raised because nobody knows the contract clause.

Waiting time

Site not ready. Team stood down. Waiting-time rates exist — but only if evidenced within 24 hours.

Rework

Client instruction caused the defect. You fixed it. You absorbed the cost.

Delays

Access delayed the programme by two weeks. Extension of time never claimed. Prelims eaten.

Disputed charges

Invoice pushed back. No evidence pack. Credit note issued 'to preserve the relationship'.

How Rekkord works

From field note to paid claim in four steps.

01
Capture

Engineer taps 'New event' on mobile. Photo, voice note, timestamp, GPS. 60 seconds.

02
Structure

AI extracts what happened, when, why it's chargeable, and which contract clause applies.

03
Price

Costs auto-build from your contract rates. Labour, materials, prelims, waiting time.

04
Recover

One-click claim pack, executive summary, and follow-up chase emails. Tracked to payment.

09:42R••• 4G
New event
Log a commercial event
51.5074° N, 0.1278° W
±4m
09:41 · GPS
09:41 · GPS
09:41 · GPS
0:12
ClientBrightwater NHS
SiteMain Hospital
TypeWaiting time
Est. value£1,480
Field-first

Built for muddy boots and gloved thumbs.

Your engineers already have a phone. In 60 seconds they capture a geotagged photo, dictate what happened, tag the client and contract, and the event is in your commercial pipeline — even offline.

  • GPS + timestamped photo and video evidence
  • Voice-to-narrative in the engineer's own words
  • Auto-linked to the correct client, contract and clause
  • Works offline, syncs when signal returns
AI drafting

A commercial director in your pocket.

Rekkord's AI reads the contract, the evidence and the event history — then drafts NEC-aware narratives, notices of delay, dispute responses and executive summaries in your tone. Not a chatbot. A commercial ghostwriter.

  • Clause-referenced narrative sections
  • Cause / effect / entitlement structured every time
  • One-click claim pack with cost build-up and evidence index
  • Chase emails and escalation letters, ready to send
RRekkord · AI Drafting
Live
Draft type
  • CE Notice (NEC4)
  • Variation request
  • Dispute response
  • Chase email
  • Exec summary
  • Recovery pack
Tone
Commercially robustFirmCollaborative
Compensation event notice
Ref CE-0142 · Brightwater NHS · Main Hospital
Drafted in 4.2s

1. Notice. Pursuant to clause 61.3, the Contractor gives notice of a Compensation Event arising on 02 July 2026 at Brightwater — Main Hospital.

2. Event. Site was not made available at agreed access time (07:30). Team of 3 engineers stood down for 2h 40m pending ward release. Evidence: geotagged arrival photo, security log signed by K. Patel, radio comms extract.

3. Clause relied on. 60.1(2) — Employer does not give access to a part of the Site by the later date shown on the Accepted Programme.

4. Effect. Cost impact £1,480.00 (waiting-time rates, Sch. 3). Time impact: 0 days on completion, prelims absorbed within float.

5. Response required. Please acknowledge within 7 days per clause 61.4.

Grounded in 5 evidence files · 2 clauses cited · Ready for QS review
Recovery tracker

A live pipeline of every unpaid extra.

A kanban board of every open claim — by client, value and days outstanding. Directors get a forecastable recovery pipeline; QSs get a to-do list; nothing sits forgotten in someone's inbox.

  • Drag between stages: draft → issued → in review → approved
  • Ageing flags on anything past its notice window
  • Per-client scorecards and recovery-rate analytics
RRekkord · Recovery Tracker
Live
13 claims · £16,750 open · avg 7d in review
All clients · All sectors
Draft · 2
  • Materials uplift — Halcyon
    £670Today
  • Missed attendance — Meridian
    £2901d
Ready to submit · 2
  • Waiting time — Brightwater
    £1,4801d
  • Failed access — Oxford St
    £3502d
Under review · 3
  • Additional labour — Northgate
    £1,8006d
  • Rework — Kingsford Rail
    £2,40012d
  • Damage — Pinnacle
    £1,4504d
Approved · 2
  • Variation — Meridian T3
    £3,250Paid 3d
  • Extra visit — Halcyon
    £900Invoice raised
Evidence vault

Every photo is a contract, geotagged.

GPS coordinates burned onto the image. SHA-256 hashes stamped on upload. Automatically linked to the event, claim and clause. When a client challenges an extra, the evidence is on the table in one click.

  • Geotagged photo, video and signed instruction capture
  • Immutable audit trail — never edited, never lost
  • Search by site, event type, date range or claim reference
RRekkord · Evidence · 2,184 files
Live
Filter: last 7 days · All sites100% geotagged · 100% timestamped · SHA-256 verified
51.5155° N, 0.1425° W
photo
29 Jun · 07:31
Site perimeter ✓
Aborted visit — Meridian Oxford St
Linked to claim· CE-010042
51.4831° N, 0.0912° W
photo
01 Jul · 07:42
Site perimeter ✓
Waiting time — Brightwater
Linked to claim· CE-010142
51.5074° N, 0.1278° W
video
28 Jun · 14:12
Site perimeter ✓
Damage — Halcyon Pinnacle
Linked to claim· CE-010242
51.5320° N, 0.1050° W
photo
26 Jun · 09:03
Site perimeter ✓
Rework — Kingsford Rail
Linked to claim· CE-010342
52.0406° N, 0.7594° W
photo
28 Jun · 16:44
Site perimeter ✓
Additional labour — Northgate DC
Linked to claim· CE-010442
51.5155° N, 0.1425° W
signed
27 Jun · 08:00
Site perimeter ✓
Missed attendance — Meridian
Linked to claim· CE-010542
Two-way project rooms

Client and contractor. One shared record. Zero email chains.

Private drafts stay private. Formal submissions, instructions and decisions land in a shared room with an immutable audit trail — visible to both sides.

RRekkord · Project Room — Brightwater NHS × Rekkord FM
Live
Contractor side · Rekkord FM
Private notes and drafts stay here — the client never sees them.
  • PrivateInternal — Target settlement £1,480
  • PrivateAI draft v2 — NEC 60.1(2), 4 evidence files attached
  • PrivateMargin note: prelims fully absorbed
Shared record · Both parties
Formal submissions, decisions and audit log.
  • CE-0142 · Waiting time · Main HospitalIssued · £1,480
    02 Jul 09:42 · Rekkord FM → Brightwater NHS · 5 files
  • Instruction — Additional ward cleanReceived
    28 Jun · Brightwater NHS → Rekkord FM · Awaiting price
  • Decision — CE-0128 approved £2,340Approved
    25 Jun · L. Owens (client approver) · signed off
Audit trail
14 shared events · 6 decisions · 22 messages · immutable
Platform

Everything your commercial team needs. Nothing they don't.

Field-first event capture

60-second mobile capture with photos, voice notes and offline sync. Engineers actually use it.

Director-grade AI drafting

NEC-aware narratives, dispute responses, notices of delay and executive summaries in your tone.

Contract-linked cost build-up

Rates, prelims and margin flow from your contracts. No spreadsheet gymnastics.

Evidence library

Photos, emails, signed instructions and site sheets — all indexed against the event and claim.

Recovery tracker

Kanban of every open claim by client, value and days-outstanding. Nothing slips.

Multi-client, multi-site

Segregated by client and contract with role-based access. Built for portfolios.

Boardroom-ready reports

Recovery numbers your CFO can walk into a board with.

Monthly recovered value, per-client recovery rate, ageing exposure, sector benchmarks — all one click from CSV or PDF.

RRekkord · Reports · H1 2026
Live
Recovered value
£k per month · approved & invoiced
£298k
YTD, +34% vs H2 25
Claims by status
  • Ready to submit1 · £358
  • Submitted1 · £1,250
  • Under review2 · £2,480
  • Approved1 · £950
  • Rejected1 · £1,130
  • Invoiced1 · £3,200
Commercial Recovery Report
All claims with statuses and values
Export CSV / PDF
Event Timeline
All events by date, geo-verified
Export CSV / PDF
Client Recovery Summary
Recovery rate per client · benchmarked
Export CSV / PDF
Customer story
"We recovered £312,000 in the first six months on work we'd normally have written off. Rekkord paid for itself in week two."
Sarah Whitfield — Commercial Director, Northline FM Services

Stop absorbing costs that aren't yours.

Spin up a fully seeded workspace, capture your first event, and export a claim pack in the next five minutes.

Rich demo data included AI drafting on tap No credit card