Use cases/Landscaping & grounds
Landscaping & grounds

Extras requested on the day become invoiced by the end of the week.

Grounds maintenance and landscaping contracts run heavy on ad-hoc requests from residents' associations, site managers and passers-by. Operatives usually just do it — and the extra never leaves the van.

RRekkord · Landscaping & grounds · Live workspace
Live
Open events
27
Value in flight
£58,240
Recovery rate
68%
Latest events
  • Waiting time — permit delay
    £1,480Needs evidence
  • Failed access — lock-out
    £350Ready to submit
  • Additional labour — site cond.
    £1,800Under review
  • Extra visit — variation
    £900Approved
+11%
contract yield across a 60-site portfolio
< 30s
operative capture time
7 days
average time to invoice extras
Event types

The commercial events happening on your sites right now.

Every one of these is a chargeable event. Rekkord captures them at source and prices them against your contract.

Additional planting / clearance

Residents' association asks for extra hedge cut.

Storm response

Fallen branch clearance outside PPM scope.

Fly-tip / litter uplift

Non-scope waste removal from grounds.

Pesticide / treatment call-out

Ad-hoc weed treatment on private paving.

Additional visit

Extra cut requested before an event.

Aborted visit

Locked estate gate — no access at scheduled time.

RRekkord · Events · 13 events · £16,750 open
Live
All statuses · All types · Rolling 30 daysAuto-linked to contracts
EventClient / SiteTypeValueStatus
Materials uplift — premium fixtures, Halcyon
Halcyon — Pinnacle HouseAdditional materials£670Draft
Waiting time — permit delay, Brightwater
Brightwater — Main HospitalWaiting time£1,480Needs evidence
Failed access — Oxford St lock-out
Meridian — Oxford St FlagshipFailed access£350Ready to submit
Additional labour — changed site conditions
Northgate — Milton Keynes DCAdditional labour£1,800Under review
Damage — client forklift struck bollard
Northgate — Milton Keynes DCDamage / incident£1,450Submitted
Rework — incorrect client spec, Waterloo
Kingsford Rail InfrastructureRework£2,400Under review
Live pipeline

Every open claim, tracked to payment.

RRekkord · Recovery Tracker
Live
13 claims · £16,750 open · avg 7d in review
All clients · All sectors
Draft · 2
  • Materials uplift — Halcyon
    £670Today
  • Missed attendance — Meridian
    £2901d
Ready to submit · 2
  • Waiting time — Brightwater
    £1,4801d
  • Failed access — Oxford St
    £3502d
Under review · 3
  • Additional labour — Northgate
    £1,8006d
  • Rework — Kingsford Rail
    £2,40012d
  • Damage — Pinnacle
    £1,4504d
Approved · 2
  • Variation — Meridian T3
    £3,250Paid 3d
  • Extra visit — Halcyon
    £900Invoice raised
Workflow

From site capture to invoice, in four steps.

  1. 1
    Team lead captures on the van

    Before / after photo, GPS, requester name captured in 30 seconds.

  2. 2
    AI drafts chargeable-extras summary

    Priced against the schedule of rates for the contract.

  3. 3
    In-app signed acceptance

    Client rep signs on the operative's phone — audit-proof.

  4. 4
    Invoice the same week

    Extras flow into the weekly billing run, not the end-of-month scramble.

Key benefits

Why landscaping & grounds teams choose Rekkord.

Contract yield goes up

Extras that used to leak as goodwill become tracked, priced and invoiced.

No operative admin

30-second capture on the van — no site diary, no end-of-day paperwork.

Dispute-proof invoicing

Photo evidence + signed instruction attached to every extra.

Portfolio-wide visibility

See yield performance across every estate, every contract, in one dashboard.

See Landscaping & grounds recovery in action.

Live demo with sector-realistic events, contracts and claims — no signup friction.